Petrarra
Tumbled Travertine Tile

The range

Tumbled Travertine Tile

The same stone, run through the tumbling drum until the edge softens and the pore stays open. Unfilled by default, which is the correct answer outdoors: an open pore drains, a resin-filled one traps water and lifts at the first frost cycle. Supplied in Light, Standard, Classic Mix, Country Classic (Scabas), Walnut and Commercial. Frost tested to 48 cycles under EN 12371.

Formats
10 × 10 – 40.6 cm
Thickness
12 / 15 mm
Finish
Tumbled, unfilled
Frost
48 cycles, EN 12371

02

Technical data

Our reading on the left, the standard on the right.

Values are typical for current production runs, tested to the European methods named in the last column. Where a harmonised standard sets a limit we quote it next to the value. The report for your material goes out with the order.

ParameterUnitPetrarraLimit / standard
Apparent densityg/cm³2.45EN 1936 — declared value, no minimum
Open porosity%2.9EN 1936 — declared value
Water absorption, atmospheric%1.6EN 13755 — declared; Denizli basin runs 0.9 – 2.6
Compressive strengthMPa62EN 1926 — declared; basin range 44 – 70
Flexural strength, concentrated loadMPa11.4EN 12372 — declared value
Abrasion resistance, wide wheelmm21EN 14157 — lower is better; declared
Frost resistancecycles48EN 12371 — flexural loss under 20 % required
Slip resistance, unpolished, dryUSRV41 honed / 57 tumbledEN 14231 — declared per finish
Thickness tolerance, calibrated tilemm± 1.0EN 12057 class 1 permits ± 1.5
Length and width tolerancemm± 0.8EN 12057 class 1 permits ± 1.0
Flatness deviation, 40.6 cm tilemm0.4in-house reject above 0.6
Reaction to fireclassA1EN 13501-1 — natural stone, without testing
Filling material—Resin + cement, colour matchedunfilled supplied for external use

Denizli stone is not one material. The values above are typical for the Ivory and Classic travertine range; Country Classic and Walnut are denser and read differently on porosity and absorption, and the marble and onyx programme is a separate sheet. Ask for the material-specific report.

Full technical table →

Send the schedule. We will send the stow plan.

Tell us the formats, the finish, the square metres and the discharge port. You get a unit price, a container loading plan and a date we will hold — usually within two working days.